We inaugurated the revitalised end of the Čiližský stream
On Friday 26.7.2024 we completed the revitalization of the lower part of the Čiližský stream with the final dig.
It was done following a number of measures we have taken to gradually improve the flow of this important 35 km long stream in the Danube region.